Quality, Health, Safety & Environment

QHSE Management

Zhanwang embeds quality, occupational health, safety and environmental management across the full lifecycle of compressor packaging systems — design, procurement, manufacturing, testing, transportation and field service. For oil & gas compressor projects, QHSE is not a standalone marketing topic but the foundation of reliable delivery and long-term safe operation.

Comply with applicable laws and regulations, customer standards and project technical specifications
Prioritize risk prevention — major risks are identified up front during design, manufacturing and field service
Embed quality control, occupational health, production safety and environmental protection into the project execution process
Improve delivery stability through continuous inspection, training, lessons-learned reviews and improvement

MANAGEMENT SYSTEM

Management System Focus

Quality Management

Following ISO 9001 requirements, applying process control to design inputs, procurement verification, manufacturing processes, inspection records, FAT testing and pre-shipment documentation.

Health and Safety

Focus on operational risks in assembly, lifting, pressure testing, electrical commissioning and field service — strengthening work permits, personal protection, equipment isolation and emergency preparedness.

Environmental Management

Aligned with ISO 14001, controlling environmental impacts from the production site, coating, waste, energy use and project packaging and shipping.

Occupational Health

Referencing ISO 45001, attending to the occupational health and working conditions of employees and partners across manufacturing, testing and field service.

PROJECT CONTROLS

Project Execution Controls

For compressor packaging projects, QHSE management must be applied to every project node that is verifiable, recordable and traceable, rather than remaining at the level of slogans.

Confirmation of standards, operating conditions, gas media and delivery boundaries at project kickoff
Procurement of key components and review of supplier quality documentation
Process inspection of welding, assembly, piping, electrical and instrumentation, and control systems
Pressure, leakage, interlock, alarm, performance and pre-shipment test verification
Pre-job safety briefing, tool checks and risk awareness ahead of field service
Closed-loop issue resolution, record archiving and continuous improvement

RISK FOCUS

Key Risk Scenarios

Lifting and HandlingPressure TestingElectrical CommissioningHot Work and WeldingEnergy IsolationField ServiceContractor CoordinationPre-Shipment Documentation

CERTIFICATE NOTE

Certificates & Documentation Note

Relevant management system certifications and qualification documents can be provided during project engagement or customer audit.